Hi,
The course, which used to be the last that finished back up was cleaned before backup was performed and now there is another. (there always has to be someone the last![lächelnd lächelnd]()
Then did some excel work and counting.
I had backed up 743 courses from existing 1910 (id go over 2000, some were deleted), starting 1:50am, finishing 5:28am.
According to report, most of the courses had backup done up to minute or two. Some starting after 5am. Nine courses backups took from 10 to 25 minutes. One needed 47 minutes to backup, did not finish the last, and is about 300MB far from the biggest one.
e.
The course, which used to be the last that finished back up was cleaned before backup was performed and now there is another. (there always has to be someone the last
Then did some excel work and counting.
I had backed up 743 courses from existing 1910 (id go over 2000, some were deleted), starting 1:50am, finishing 5:28am.
According to report, most of the courses had backup done up to minute or two. Some starting after 5am. Nine courses backups took from 10 to 25 minutes. One needed 47 minutes to backup, did not finish the last, and is about 300MB far from the biggest one.